Your Dream Kitchen, Designed Before We Build
See every cabinet, countertop, and fixture in 3D before demolition day.
The kitchen is the most complex room to remodel. Every decision affects the next: cabinet layout dictates counter space, appliance placement drives electrical, plumbing constrains the sink location. Our design-first process eliminates the biggest risk in kitchen remodeling: realizing you hate the layout after the old one is torn out.
Years in the Bay Area
Licensed since 2005. Hundreds of projects completed across the South Bay, Peninsula, and beyond.
BuildZoom Rated
Ranked in the top 1% of Bay Area contractors based on qualifications, performance, and reliability.
Design-First Process
See every detail in 3D before construction. Our two-phase approach separates design from build so you never commit blind.
Change Orders
When you follow our full two-phase process from A to Z, every decision is locked in during design. No mid-project surprises.
Itemized Pricing
Every material, every line item, visible before you sign. No allowances, no hidden fees.
Why Choose Custom Home for Kitchen Remodeling
Complete Layout Redesign
Rethink your kitchen from scratch. We optimize the work triangle, maximize storage, and create a layout that fits how you actually cook and entertain.
Premium Material Selection
Choose from stone countertops, custom cabinetry, designer tile, and premium fixtures. See every material rendered in your actual space before ordering.
Appliance Integration Planning
Built-in refrigerators, range hoods, double ovens, and specialty appliances planned into the design from day one. No last-minute surprises with clearances or connections.
Lighting and Electrical Design
Task lighting, under-cabinet LEDs, pendant fixtures, and outlet placement all finalized during the design phase. Your kitchen will be as functional as it is beautiful.
What to Expect
Cost depends on kitchen size, material selections, and whether the layout changes. Custom cabinetry and premium stone are the largest cost drivers.
Key Cost Factors
- Kitchen size and layout complexity
- Cabinet type (stock vs. semi-custom vs. custom)
- Countertop material
- Appliance selections
- Plumbing and electrical changes
All pricing is approximate and subject to change. Every project is unique, and final costs are determined on a project-by-project basis during our design phase.
Ready to discuss your kitchen remodeling project? Call (888) 306-1688 or schedule a consultation.
Frequently Asked Questions
How much does a kitchen remodel cost in the Bay Area?
Bay Area kitchen remodel costs vary based on size, materials, and whether the layout changes. A standard kitchen renovation with quality materials starts around $75,000, while high-end kitchens with custom cabinetry and premium stone can exceed $200,000. Our design phase gives you exact line-item costs before we start.
How long does a kitchen remodel take?
Most kitchen remodels take 3 to 6 months from design through completion. The design phase typically runs 3 to 6 weeks, and construction takes 8 to 16 weeks depending on complexity. Layout changes or structural modifications add time, but the design phase ensures construction runs on schedule.
Can I use my kitchen during the remodel?
For most kitchen remodels, we recommend setting up a temporary kitchen in another room. We help you plan for this during the design phase. Depending on the scope, you may have limited access during certain stages, but full gut renovations typically mean the kitchen is offline for the duration of construction.
What's included in a kitchen remodel?
Our kitchen remodels cover everything: demolition, cabinetry, countertops, backsplash, flooring, lighting, plumbing fixtures, appliance installation, electrical, and painting. We provide a complete itemized scope so nothing is left to guesswork.